×

Talk to us about your project!

Circontrol knows how to help installers and operators to provide their

electric or hybrid vehicle charging infrastructures.

Do you want to know more about it? Fill the form below, and we'll contact you very soon!



Circontrol will use the information given in this form to send you information regarding our activities and marketing campaigns. You can change your opinion at any moment contacting us at marketing@circontrol.com

Lite Charging Hub

by DLM 7 Lite

A cost-effective solution for public charging that combines DC and AC charging and minimizes operational costs

 

A cost-effective solution for public charge that combines DC + AC

 

  • Combine your DC charger with up to 7 AC chargers avoiding grid overloads.
  • Minimize your operational costs and avoid the cost of updating the electrical infrastructure in the area.
  • Recover your investment in under 3 years.
  • Prioritize your DC charging transactions and balance the AC charging points based on occupancy.
  • A compact solution that can be installed in both our Raption and eVolve Series and inside an electric cabinet.

 

What is DLM 7 Lite?

Circontrol’s Dynamic Load Management (DLM) system is a combination of software and hardware. The DLM 7 Lite is the compact version of this solution,
capable of managing the power of up to seven AC chargers. Its small hardware size allows for installation inside a DC charger, making it very useful for certain charging segments, such as public areas, where Charge Point Operators may face supply limits. As a result, a combination of one DC charger and
several AC stations can be installed, which we refer to as a Lite Charging Hub. The DC station will always have priority, and the other chargers will balance their power based on demand.

 

How does DLM 7 Lite make this charging solution possible?

 

The system uses the Building Monitoring Kit (BMK), an optional power analyzer for the DLM, to monitor the consumption of the DC charger. This enables it to prioritize DC charging sessions and prevent exceeding power requirements.

 

View more about DLM

 

Other Documents

(will be sent after submitting the questionnaire)

You can read our data privacy and protection policy here.

WEBINARIO: Impacto del Real Decreto 29/2021 y 184/2022 en el Parking (7 de Junio)
This is default text for notification bar